Skip to main content
Outages, Detours, and Closures

Cafeteria

Cafeteria Construction Small

Jacobsen Construction has prepared sites for demolition and construction for the new cafeteria. During this process, safety is a top priority. Please be aware these sites are temporary. As construction continues, the size of the sites will expand. There will be no pedestrian traffic along the Academic Oval by the construction site. Pedestrians are asked to use the walkway by the tennis courts between the McKay Gymnasium & Pool to Hale 1.

Side walk final